CONSISTING OF:
Lead Melting Furnace:
Target Melt Rate of 44,000 Lbs. of a
96% Lead / 4% Tin Alloy in 3 to 4 Hours
System to Hold Metal at a Working Temperature
of 700 to 750 Deg. F, For Single Shift
Casting Operation
FivesNA Natural Gas Combustion and Control
System with a Maximum Heating Capacity
of 2.7MM BTU/Hr Input
Combustion System will include (2) Gas Burners
(1) Heating Zone with (1) Furnace Thermocouple
and (1) Furnace Excess Temperature
Interlock Thermocouple
Furnace Lining: 6" Thick Ceramic Fiber
Upper Wall, Brick and Castable
Lower Wall and Hearth
Fuel: Natural Gas at 5 PSIG and 1,020 BTU/Ft3
Electrical Control: 120/60/1
Electrical Power: 230/60/3
ECONOMY Model MC-20 Lead Ingot Casting Machine:
Will Cast 7 Tons Per Hour
(9) 6" Pith Chain
Each Mould will Cast (1) 60 Lb. Ingot
COST WHEN NEW WAS OVER $300,000
RETURN